Operations can be confirmed in several sittings with a rework quantity, plus fixes to the Production Order form, PO notes and balance-list exports.
Complete Refuses an Operation Confirmed Short
The shop-floor Complete button closed an operation however much was still open, so 60,000 of 70,000 showed as Completed. It now refuses, states the open quantity, and points to Final Confirmation for a deliberate short close.
Data Upload Matches Lookups in the Right Scope
A data upload matched a value such as a department name against every hierarchy, so a name that existed in two hierarchies matched twice and the row failed. A lookup now honours the field's own scope (for example, only the enterprise hierarchy for a department), and the upload template lists the same choices.
Production Order Form Opens for Editing
Opening an existing production order for editing crashed the form. It now opens normally.
Purchase Order Notes and Terms in Edit and Display
Editing a purchase order opened with blank notes, terms and addresses because the form used the list record. It now loads the full order, and the expanded grid row shows Notes and Terms.
Balance List Excel Shows Debit and Credit
The Vendor and Customer Balance List Excel export now has Opening and Closing Dr / Cr columns, including the totals row, so the sign of a balance is no longer ambiguous.
Shop-Floor Work Orders Grid
- Saved column layouts per user, column chooser, resizing, and Excel and PDF export.
- Date columns filter by range (between, before, after) by day.
- The sales order filter loads quickly from the operations themselves.
Rework Quantity on Confirmation
A rework quantity can be keyed on confirmation. It is a record only: reworked pieces come back and are confirmed as good later, so they do not consume components, are not written off and are not received. Negative quantities are refused.
Statutory Bonus UAT Scripts and Help Articles
Five UAT scripts (setup, run and calculation, approval and payment, interim and supplementary runs, exit bonus and reports) and Help Centre articles for Statutory Bonus.
Partial Operation Confirmation
Production Confirmation now records what was produced in each sitting and adds it to the operation's totals. The operation stays In Progress until good plus scrapped reaches the order quantity, or the confirmation is marked Final to close it short.
- A partial confirmation posts nothing; the closing one posts the back-flush, receipt and scrap once, on the cumulative quantities.
- Two confirmations of the same operation at the same time both count.